2. |
Machine
Setup and Operation |
|
|
2. |
Machine
Setup and Operation |
- Increase
settle blow
- Change
baffle
- Improve
loading by use of better grade of spray oil or smaller deflector
- Align
deflector with center of blank mold
- Increase
pressing time and/or pressure
- Change
neck ring and plunger
- Retard
counterblow
- Swab
blanks more frequently, adjust doping spray
- Improve
venting of finish equipment
- Increase
vacuum time
- Readjust
baffle and funnel timing
- Use
neck ring cooling nozzle
- Check
if correct loading position is used
- Reduce
blank mold temperature-correct cooling and swab
- Switch
blanks around front to back
|
|